Close
Shopping Categories
Search

3 Phase 0.7 hp (550W) Regenerative Blower, 380V, 59 cfm


$566.12
Three-phase 0.7 hp (550W) high pressure blower for sale online. △220-240V / Y345-415V voltage, 2.8△ A / 1.6Y A current, 50 Hz
SKU: CHN-RB-380-550
Free Shipping Worldwide
Delivery date: 6-12 days

Good price high pressure vortex blower can be used as aerator for fish ponds. 0.55 kW motor runs smoothly and causes lower noise.

Specification

ModelCHN-2PB310H06
Phase3
Frequency50
Power0.7 hp (550W)
Voltage (AC)△220-240V / Y345-415V
Current2.8△ A / 1.6Y A
Max airflow100 m³/ h (59 cfm)
Rated vacuum pressure-110 mbar
Rated compress pressure120 mbar
Noise55 dB (A)
Weight14 kg

Dimention (Unit: mm)

Dimension of ATO 0.7 hp regenerative blower

ABCDEFGHJKLMNOPQΦRSUV (1~)V' (1~)V1 (3~)V1' (3~)YXZX-HOLESΦX
2682729320522609214110183108826941G11/464103M6X17//M25X1.5M16X1.5M6X150°/ 120°/ 240°160

Tips: Maintenance steps of high pressure regenerative blower

  • Before maintenance, disconnect the main power supply of the high pressure regenerative blower and put up a sign.
  • Rotate the fan blade by hand, observe the rotation, and adjust the tightness of the belt or the gap and centering of the coupling.
  • Check whether the gaskets and packings on each joint surface are sealed, and replace them if necessary.
  • Clean the fan blades, the outside of the blower casing and the outer surface of the motor. When there is a lot of oil on the surface of the wind blade, it should be soaked and scrubbed with detergent.
  • Add lubricating oil (grease) to each rotating part and adjust the air valve drive mechanism to make it flexible and reliable.
  • Detect the insulation resistance of the motor windings, tighten the terminals of the power cord, and check whether the motor grounding is good.
  • Check whether the various electrical appliances in the high pressure blower control cabinet are in good condition, and fasten the terminals.
  • Check whether the air valve transmission mechanism is flexible and reliable, whether the wires are damaged, and whether the wire connectors are well tightened.
  • Turn on the main power supply of the high pressure blower and check whether the power supply indication is normal.
  • Adjust the belt pulley and belt.
  • Start the trial operation for half an hour, observe that the indicator lights of each instrument should be normal, and there is no abnormal noise in operation, then the high pressure regenerative air blower is cleaned up and can be used with confidence.